0 photos

We expressed concern over the foundation during the design phase, so it was over designed to ensure robustness. The large size of the footers along with heavier than typical re-bar drew comments from the workers. "Are you building a bridge?" "This looks like a bunker." Both the house and garage were built with steel grid reinforced 6" thick slabs. The concrete was poured continuously from footer up to the top level of the slabs creating a "monolithic" foundation. This work was contracted to Luciano Concrete.
This gallery is empty.